Main Menu

Explore More

Proposition 2

K-12 Renovations and Infrastructure Upgrades – $15 million

Proposition 2 includes the highest priority renovations and infrastructure upgrades at Bennett and the Middle/High School. They include “nuts and bolts” building updates, modernizations to support the education program, and drainage improvements for athletic facilities.

At Bennett Elementary School: 

  • Replace windows that are 60+ years old, single-pane and inefficient; replace and/or restore exterior walls as needed when old windows are removed.
  • Modernize two Music Rooms (which were originally designed as kindergarten classrooms) to square off their hexagon shape, make them soundproof and about 30% larger, and improve acoustics, technology and instrument storage.
  • Renovate restrooms in the front hallway, which are 60+ years old, with modern plumbing and accessibility.
  • Replace old ceiling and lighting in 12 classrooms and a corridor in the front wing, which do not use energy efficiently and are nearing the end of their useful life.

At the Middle/High School:

  • Modernize three High School science classrooms/labs, including new acid waste lines; add A/C there.
  • Enhance and improve privacy for the nurses’ offices; add A/C there.
  • Improve the grass field area with better drainage for the soccer field, re-grading in the field hockey area; new fencing along the baseball field; a concrete pad so bleachers can be positioned to face the soccer or softball field; and ADA-compliant pathways and parking.
  • Resurface only the top layer of the running track.

What are the current conditions?

What’s possible with voter approval?